- Arthur Street - Highway 61 to Parkdale Boulevard Carry-over work
- Memorial Avenue - Second Avenue to Ontario Street
Construction Projects
Each year, the City of Thunder Bay manages numerous construction projects to maintain and improve critical infrastructure for our community. On this page, you can find information on projects scheduled for this year.
Active Construction Projects
The map below shows currently active construction projects:
2026 Construction Projects
Click on the button below to view a map of all construction projects scheduled for 2026.
View the 2026 Construction Projects map
The list below provides more information on the construction projects scheduled for the 2026 season. These projects are part of our ongoing efforts to maintain and improve local infrastructure.
Asphalt Surface Rehabilitation
The City uses a Pavement Management System (PMS) to plan, design, construct, and maintain the road network. Every five years, Engineering completes a city-wide pavement condition survey that measures surface defects, cracking, and overall ride quality. The data is analyzed through the PMS to determine which road segments should be resurfaced or reconstructed.
Arterial and collector roads are prioritized because they carry the highest traffic volumes, connect major destinations, and have the greatest impact on overall network performance. Local residential streets are generally scheduled once their pavement condition has deteriorated further.
Click each cateogry below to see a list of the areas with work scheduled to be completed in the 2026 construction season.
- Ottawa Street - Chilton Avenue to Morgan Avenue
- Sifton Avenue - Arthur Street to Terminal Street
- Wilroy Avenue - Arthur Street to Terminal Street
- Morgan Avenue - Terminal Street to dead end
- Terminal Street - Chilton Avenue to Morgan Avenue
- Granite Road - Community Hall Road to Toms Road
- Leland Avenue South - Walsh Street to Gordon Street
- Lansing Street - Landsdowne Court to Churchill Drive
- Junot Avenue - Walkover Street to Red River Road
- High Street - #176 to #188 (Full Width)
- Oliver Road - #1126 to Conservation Road
- Central Avenue - Memorial Avenue to Walmart
- Arthur Street West - Brown Street to #110
- Yonge Street - Quebec Street to abandoned train
- Miles Street - Balmoral Street to Wellington Street
- May Street - William Street to Durban Street
- Madeline Street - River Street to Crescent Avenue
- Thunder Bay Community Auditorium parking lot
- Innovation Drive - Golf Links Road to 300 metres west
- Innovation Drive at Golf Links Road
- Harbour Expressway at Golf Links Road
Sidewalks and Pedestrians Crossings
- County Boulevard (Both sides) - Perth Street to East Avenue
- Algoma Street North (West side) - Red River Road to Camelot Street
- Van Norman Street (North side) - Jean Street to Algoma Street
- Oliver Road (North Side) - Keith Jobbitt Drive to Balmoral Street (Multi-use trail) Carry-over work
- Oliver Road (South side) - Burwood Road to Golf Links Road
- Pacific Avenue (South side) - Robertson Street to McMurray Street
- Sibley Drive (North side) - Keewatin Street to Balmoral Street
- Central Avenue - Riverside Drive to Lyons Ditch (Multi-use trail on south side, new sidewalk on north side)
- New Pedestrian Crossovers:
- Franklin Street and Donald Street
- Huron Avenue (near Matthews Street)
- Victoria Avenue and Hyde Park Avenue
Mid-Block Pedestrian Signals: Pedestrian-activated traffic signals that provide controlled crossing points at mid-block locations.
Pedestrian Crossovers (PXOs): Marked crossings that include pavement markings, signage, and, in some cases, flashing yellow lights.
- Oliver Road - Pedestrian bridge over McIntyre River
- Transit bus pads (23 locations)
Sewer & Watermains
Many roadway projects are coordinated with underground infrastructure upgrades, including sanitary sewers, watermains, and storm sewers.
- Cumberland Street - Tupper Street to McVicar Street Carry-over work
- Cumberland Street - Tupper Street to Pearl Street
- Simpson Street - Robertson Street to Rowand Carry-over work
- Simpson Street - Victoria Avenue to Dease Street (final lift of asphalt paving) Carry-over work
- Luci Court - Isabella Street to Moodie Street
- Brock Street - Brown Street to Heath Street
- Pacific Avenue - Prince Arthur Boulevard to Minnesota Street
- College Street - Red River Road to Hebert Street
- McIntyre Street - Court Street to Cumberland Street
- McMillan Street - Southern Avenue to Pacific Avenue
- Dufferin Street - High Street to Dixon Street (project also includes a new sidewalk) Carry-over work
WATERMAIN LOOPINGExtension of watermains to improve water quality, system pressure, and reliability.
- Chapples Supply - Under Floodway Carry-over work
- Waterford Street - Waterford Street to Carrick Street
- Dalton Avenue - Dalton Avenue to Ray Boulevard
- Martin Avenue - Ponderosa Drive to 100 metres west
- Burwood Road - Oliver Road to north of Oliver Road
- McBean Street - John Street to Oliver Road (Project also includes resurfacing of the road, spot repairs to curb and gutter, and a section of new sanitary sewer)
- Oliver Road - Oliver Road to Ray Boulevard (Drainage Channel)
- Innova Park (Stormwater Pond, Storm Sewer)
Bridge Rehabilitation
- Pacific Avenue Bridge
- Central Avenue Overpass (Railing)
Cement Mortar Lining
Cleaning and re-lining of existing watermains with cement mortar to improve water quality, hydraulic capacity, and fire flow.
- Strathcona Avenue
- Hodder Avenue
- Gresley Court
- Arundel Street (section)
Hot-in Place Asphalt
This rehabilitation technique involves heating the existing asphalt, milling the upper layer, adding rejuvenating agents and supplementary asphalt, and re-laying the material in a single continuous operation.
- Oliver Road - Ellen Road to Mapleward Road
- Oliver Road - Highway 11/17 to Ellen Road Carry-over work
- Fort William Road - First Avenue to Bay Street Carry-over work
Sign up to our Newsletter
Stay up to date on the city's activities, events, programs and operations by subscribing to our eNewsletters.